#79363
Ray2U
Flatchatter

    Hi

    Your experience sounds very similar to what we are going through right now.

    But what I have found is the Engineering Company’s people are not licenced to:

    1. Produce a Building Condition Report which is the basis for what needs to be fixed.
      They called it an Engineering Inspection Report.
    2. Produce a Regulated Design which is the basis for how the waterproofing is going to be fixed.
      They called it a Remediation Engineering Specification

    If it’s the same company I would recommend that you check those documents carefully before the OC commits to spending money.

    I’m okay if Jimmy T wants to share my email details with you so we can compare notes.

    Cheers