› Flat Chat Strata Forum › Strata Committees › Dysfunctional EC › Current Page
Thanks for your comments and advice
The owner requesting the timber floor has been told that he will have to wait for a decision
The other owner who put down the timber floor without permission sold up soon after
So, we introduced (with the agreement of the required 75% of owners) the new by law with the express purpose of stopping any further timber floors. Those same owners that agreed to that by law now seem to have changed their minds – perhaps because they will not be affected by the extra noise in this case. I certainly do not regret that the by law was introduced
I realise that getting signatures on a letter to the SM and producing a doctor’s certificate are irrelevant but there are some bleeding hearts on our committee
We have been given no details about insulation for the proposed timber floor
I have been trying to control the situation – by pointing out to the EC members that a meeting must be held. and by scheduling a physical meeting that lapsed. I have asked the SM to carry out another postal vote
I have a question though. At the last postal vote, the EC members that did vote gave their proxies to the meeting chairman who was our SM. How do I make sure that I am the chairman for the next postal vote? Is it as simple as just telling the SM?
Thanks again