#22334
Cosmo
Flatchatter

    The railings are only required to be brought up to current standard if there has been any modification/repair/rectification work done that affected them.

    For example in our Strata when installing cladding to the outside of the building the railings were modified to better attach them to the building. When we looked into it, because we had them modified we were required to ensure they complied with current standards.