Topic
-
Thank you to all on this forum to start with.
The issue I have is an old 50’s bathroom, scheme subjected to schedule 1 by laws blah blah…. Bathroom has no waterproofing as that was what was in the day…. Damage is occurring to sub floor and internal walls (shown on the strata plan)… Bathroom is upper level (top floor)…
Bathroom floods with sewerage from time to time as pipes are rusted to the extreme, agreed we replace under flooring pipe work….and stack..
Levy has been raised for water proofing $5K, additional we agreed at mediation for under flooring work, and now we have further issues, back wall with the pipe connecting to the wall for the inlet f the loo has as a constant leak due to old rusted water pipe work which can’t be fixed… etc….
Bathroom needs replacing, been told to replace at my cost blah blah and everything, strata scheme registered prior to 1974…. It’s not my responsibility, I am so tired of fighting the fight! Help please…….. What’s what!
Last note raised a motion motion at an EGM to obtain 2 x quotes for building inspectors to tell us the scopes of the works – knocked down…….