    I don’t know if defect inspections in a new building are standard practice but they are a very good idea.

    Currently the time limit for claiming rectification of non-major defects is two years (and major defects six).

    Non-major defects are basically anything that needs repair but doesn’t mean the building or apartments in it can’t be occupied. Cracked tiles or ceilings, leaking roofs, wobbly balcony balustrades etc etc etc all come under “non-major”.

    Your EC is to be congratulated on getting on top of this before time runs out.

    If you want to be alerted when anyone replies to your posts or responds to this topic, please register and login, then you will be able to subscribe to the topic. The opinions offered in these Forum posts and replies are not intended to be taken as legal advice. Readers with serious issues should consult experienced strata lawyers. NB: Longer threads may spill over to additional pages - look for the numbers on the bottom right, under the last post.