#27718
Jimmy-T
Keymaster

    @WinterHill said:
    Would we have a fair claim to get the body corporate to pay to have the lattice re-built, as it was completely done without our knowledge or approval?   

    Absolutely.  They removed your property and you are entitled to demand that they replace it with the same or an acceptable alternative – or pay your bills when you do it yourself.

    But check with them to discover what their problem was and perhaps you can compromise on the replacement.

    This is entirely their responsibility and there’s no reason that you should suffer because some hyperactive member of your strata committee can’t take the time to read the building’s by-laws.

    If you get any resistance, tell them this is a cut and dried case and they can either just do it or be dragged through NCAT at their expense, and then do it.

    If you want to be alerted when anyone replies to your posts or responds to this topic, please register and login, then you will be able to subscribe to the topic. The opinions offered in these Forum posts and replies are not intended to be taken as legal advice. Readers with serious issues should consult experienced strata lawyers. NB: Longer threads may spill over to additional pages - look for the numbers on the bottom right, under the last post.