    The place to start, especially if you are in NSW, is to download and read through the WattBlock report (<span lang=”EN-GB”>https://www.wattblock.com/recharge.html)</span>. It has everything from assessing the electrical supply capacity of the building to work out what sorts of system you could have and might like to have through to model by-laws for different circumstances.

    There is a lot to consider. I would be very happy to have a chat by phone to talk through some of the basics and options, which might be easier than diving in at the deep end. For a start, 7kW is not necessarily always possible or necessary. Send me personal message and we could work out a time to talk.