Forums From the Front Page Current Page

  • Creator
    Topic
  • #83776 Reply | Quote
    Jimmy-T
    Keymaster

      The petrol crisis may be temporary – let’s hope so – but new strata laws will make it easier for unit owners to install EV charging in their car spaces.

      [See the full post at: Charge of the EV brigade to meet less resistance]

      If you want to be alerted when anyone replies to your posts or responds to this topic, please register and login, then you will be able to subscribe to the topic. The opinions offered in these Forum posts and replies are not intended to be taken as legal advice. Readers with serious issues should consult experienced strata lawyers. NB: Longer threads may spill over to additional pages - look for the numbers on the bottom right, under the last post.
    Viewing 2 replies - 1 through 2 (of 2 total)
    • Author
      Replies
    • #83797 Reply
      Strata Ken
      Flatchatter

        Running electricity to individual car spaces will be a pain. It will probably be quite expensive to run one, but unless the government provides some sort of program, they are unlikely to want to do all spaces. There are already problems in some areas due to replacing gas with electricity, adding in EV charging is going to increase the risk that substations etc will need to be upgraded. I heard about one where they wanted fast charging and just the cost of substation and wiring improvements was $375k for 24 units. It is a good time to be an electrical engineer.

        #83806 Reply
        Jimmy-T
        Keymaster
        Chat-starter

          Running electricity to individual car spaces will be a pain. It will probably be quite expensive to run one, but unless the government provides some sort of program, they are unlikely to want to do all spaces.

          There are half a dozen companies that will provide systems that tap into existing wiring to provide off-peak charging to allow cars to be charged overnight when they are sitting doing nothing anyway.

          … adding in EV charging is going to increase the risk that substations etc will need to be upgraded. I heard about one where they wanted fast charging and just the cost of substation and wiring improvements was $375k for 24 units.

          We are victims of petrol-pump thinking. Off-peak charging will have little or no impact on the available power supply. The only people who NEED on-site fast charging are Uber drivers or anyone else who shares cars that are never parked overnight.

          It is a good time to be an electrical engineer.

          As it ever was.

           

          If you want to be alerted when anyone replies to your posts or responds to this topic, please register and login, then you will be able to subscribe to the topic. The opinions offered in these Forum posts and replies are not intended to be taken as legal advice. Readers with serious issues should consult experienced strata lawyers. NB: Longer threads may spill over to additional pages - look for the numbers on the bottom right, under the last post.
        Viewing 2 replies - 1 through 2 (of 2 total)
        Reply To: Charge of the EV brigade to meet less resistance
        PLEASE ... If your property is not in NSW, mention its location (state). Don't identify companies or individuals by name. Don't mention or promote your company or services. Keep acronyms and initials to a minimum. Please, don’t use “quote” unless there is a specific point to which you wish to refer, then highlight (define) that specific passage before you click on "quote". Otherwise just use reply. THANKS.

        You can use BBCodes to format your content.
        Your account can't use all available BBCodes, they will be stripped before saving.

        Your information:




        Forums From the Front Page Current Page